翻訳と辞書
Words near each other
・ Higashi-Ōgaki Station
・ Higashi-ōjima Station
・ Higashi-Ōme Station
・ Higashi-Ōmiya Station
・ Higashi-Ōsaki Station
・ Higashiagatsuma, Gunma
・ Higashiawakura, Okayama
・ Higashiazai District, Shiga
・ Higashichichibu, Saitama
・ Higashichikuma District, Nagano
・ Higashichō Station
・ Higashidate Station
・ Higashide
・ Higashidōri Nuclear Power Plant
・ Higashidōri, Aomori
Higashifuji-goko Road
・ Higashifushimi Kunihide
・ Higashigotanda, Shinagawa, Tokyo
・ Higashihama Station
・ Higashihiroshima
・ Higashiibaraki District, Ibaraki
・ Higashiichiki, Kagoshima
・ Higashiiwai District, Iwate
・ Higashiiyayama, Tokushima
・ Higashiizu
・ Higashiizumo, Shimane
・ Higashijo Dam
・ Higashikagawa, Kagawa
・ Higashikagura, Hokkaido
・ Higashikamo District, Aichi


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Higashifuji-goko Road : ウィキペディア英語版
Higashifuji-goko Road

The (lit. East Fuji Five Lakes Road) is a 2-laned toll road linking Yamanashi Prefecture and Shizuoka Prefecture in Japan. It is owned and managed by Central Nippon Expressway Company.
==Overview==

Officially the road is designated as a bypass for National Route 138. It is also classified as a road for and access is controlled with interchanges and junctions in a similar manner to national expressways in Japan.
The road functions as an extension of the Chūō Expressway Kawaguchiko Route (a branch route of the Chūō Expressway) in southern Yamanashi Prefecture, passing along the eastern base of Mount Fuji and to the west of the Fuji Five Lakes. The road then crosses into Shizuoka Prefecture to the south. The road terminates at an interchange with the original National Route 138; beyond this point, National Route 138 contiunes towards the city of Gotenba and an interchange with the Tōmei Expressway.
Tolls are collected at toll plazas located at both ends of the road. Each toll plaza collects 520 yen from regular passenger vehicles. Traversing the entire road therefore costs 1040 yen, while entering or exiting the road at the halfway point (Yamanakako Interchange) costs only 520 yen. Electronic Toll Collection (ETC) is accepted for payment, however no discount programs are in effect.
The northern half of the road was completed in 1986 and the southern half was completed in 1989.〔(【引用サイトリンク】 title= Fujisan-net Website )

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Higashifuji-goko Road」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.